진행워터웨이

카테고리버튼

pc gnb

닫기

Product Overview

Jinhaeng Waterway, a company that cares about customer health and nature's health

Rust Scale lonizer

Differences method of construction 1Types and Problems of Piping

  • Copper pipes
    - Problems of blue/green stain after 5 years (harmful for human body)
    - Especially common in Korea
  • Stainless steel pipe
    - Problems of germs and bacteria after 5 years
    - Partial occurrence in every 10 years
  • Cast iron pipe
    - Problems of scale and rust
  • Cement lining pipe
    - Problems with coating peeling
    - No rehabilitation in the event of a rusted water
  • PE pipe
    - Problems with germs and bacteria after 3 years
  • Zinc galvanized steel pipe
    - Problems with rusted water after 7 years
    - Leakage after 10 years
    - Requires the replacement of 15-year-old pipes
    - Replacement of pipes in 15 years

Differences method of construction 2Comparison with other methods

  • Replacement of piping

    • - The most common way
    • - The final stage of piping management due to high cost and pollution problem
  • Cleaning

    • - Low cost
    • - Must be carried out periodically and constantly incurred
  • Coating

    • - Simple removal of rust, scale and water
    • - Concern raised about health epidemics caused by carcinogenic substances (bisphenol A) in raw materials
  • Chemicals

    • - Cheapest
    • - Concern raised for health and deterioration of water quality, continuous input
화살표
  • - Addressing foodborne bacteria and corrosion problems
  • - Solve problems of germs, water scale and high management cost
  • - Low cost, most economical
  • - Demonstrated confirmation of effectiveness

Table of Comparison

Methods Process Cost per household Remarks
Replacement of piping Stainless 400(ten thousand won) High cost, Chrome spills
Copper pipes 25(ten thousand won) Brass rust formation
PVC 12(ten thousand won) Inadequate for the use of hot water
Anti-rust agent Chemicals 5(ten thousand won) annually Hazard / 15 years’ use: 75 (ten thousand won) + Maintenance cost
Epoxy lining Epoxy coating inside piping 180(ten thousand won) In case of coating delamination and rust occurs during
No rehabilitation → Replacement
JHWaterway
Rust Scale Ionizer
Installation after pipe cutting 10~20(ten thousand won) Prevention and removal of slime, scale, and rust Extension of piping life (Including household pipe)