Jinhaeng RSI
Installation Performance
Public Building Installation Cases
Installed in major public institutions including the Blue House, Gyeonggi Provincial Government, Incheon Metropolitan Government, Gyeonggi-do, Siheung City Hall and waterworks office, Yeongwol County and waterworks office, Seoul Transportation Corporation, Ministry of National Defense and military facilities, Korea Electric Power Corporation, Korea Gas Corporation, Korea Water Resources Corporation, U.S. military bases in Korea, Korea Railroad Corporation, local waterworks unions, industrial complexes,
and more than 300,000 total installations.
Siheung City Hall
- In 2024, during a second-phase rollout, Jinhaeng RSI was installed at 58 locations, including Siheung City Hall and affiliated public buildings.
- The unit originally installed in 2006 had been operating successfully for 18 years before being replaced with a new model.
- Inspection of the Jinhaeng RSI unit installed in 2006 confirmed that no blue-green copper corrosion was found in the downstream piping section after the unit.
*Copper pipes generally begin corrosion after approximately 5 years, while 30–40 years is often considered the expected replacement period due to lifespan limits.
Since Siheung City Hall was completed in 1997, the building had exceeded this period, making corrosion likely. However, the pipe section protected by Jinhaeng RSI remained in sound condition.
-
- Jinhaeng RSI Replacement Installation
-
Installed in 2006
Replaced in 2024
-
- 18 Years After Jinhaeng RSI Installation
-
Before RSI installation
Area protected by RSI
Jeonju Wansan Swimming Pool
- Following the proven effectiveness of the first installation in 2021, nine additional installations were completed in 2024.
- Inspection after four months of operation confirmed that foreign substance adhesion inside the pipes had been prevented, maintaining clean pipe conditions.
By installing Jinhaeng RSI, chemical usage was reduced, and improved water quality free from biofilm and bacteria resulted in higher user satisfaction.
-
- Jinhaeng RSI Installation
-
Competition Pool Water Supply Line(250A)
Diving Pool Water Supply Line(250A)
-
- Inspection Results After 4 Months
-
Before Installation
After 4 Months
Municipal Water Supply Installation Cases
Installed in municipal water systems across South Korea, including major cities and regions such as Ulsan Metropolitan City, Gwangju Metropolitan City, Daegu Metropolitan City, Daejeon Metropolitan City, Yongin, Ansan, Uiwang, Icheon, Gyeongju, Gumi, Miryang, Yeongam, Jinju, Goyang, Gunsan, Nonsan, Jecheon, Cheonan, Dangjin, Buan, Chuncheon, and more.
Adopted by over 130 local governments with more than 25,000 installations nationwide.
Icheon Municipal Water Supply
- In 2010, Icheon installed Jinhaeng RSI and confirmed its effectiveness over a 10-year period.
- Rust was converted into magnetite, while scale and biofilm were removed, resolving long-standing red water complaints from residents.
- Based on these proven results, the city expanded installation to the largest water supply main in Korea at the time, with a diameter of 900 mm.
Cast iron pipes are generally considered to have an approximate replacement cycle of 30 years.
Since many areas of Icheon were developed during the housing boom after 1975, numerous pipelines had exceeded their expected service life, yet Jinhaeng RSI demonstrated long-term pipe protection effectiveness.
10-Year Inspection Verification
-
Before Installation -
After 9 Months -
After 4 Years 5 Months -
After 10 Years
First 900 mm Large-Diameter Installation in Korea
Gumi Municipal Water Supply
- Jinhaeng RSI was installed in the Wonpyeong-dong and industrial complex water supply pipelines after more than 30 years of operation.
- Inspection in 2025 confirmed that most rust had been converted into magnetite, while scale and biofilm had been removed.
Cast iron pipes are generally considered to have an approximate replacement cycle of 30 years.
Many pipelines in Gumi have now exceeded 50 years of service life, making pipe deterioration a serious concern.
-
- Wonpyeong-dong – 19 Years After Jinhaeng RSI Installation
-
Before Installation (2006)
19 Years After Installation (2025) - Pipeline Installed: 1978
- Jinhaeng RSI Installed: 2006 (after 28 years of operation)
-
- Industrial Complex – 16 Years After Jinhaeng RSI Installation
-
Before Installation (2009)
16 Years After Installation (2025) - Pipeline Installed: 1979
- Jinhaeng RSI Installed: 2009 (after 30 years of operation)
Large-Diameter Water Main
-
Geochang County Water Purification Plant
-
Gumi City Naedong Waterworks Facility
-
Gwangmyeong City Water Treatment Plant
-
Dangjin City New Residential Development Area
-
Hapcheon County Water Supply Facility
-
Gunwi County Integrated Water Purification Plant
-
Gyeongsan City Municipal Water Supply
-
Anseong City Municipal Water Supply
-
Yesan County Municipal Water Supply
-
Gyeryong City Municipal Water Supply
-
Gwacheon City Municipal Water Supply
-
Namyangju City Byeollae New Town
Apartment Installation Cases
Trusted by apartment communities across South Korea, with installations in premium residential complexes and over 250 apartment sites nationwide.
Seoul Dunchon Jugong Apartment
- In 2007, Jinhaeng RSI was installed due to severe rust, leakage, and high repair costs caused by aging pipes. It operated without pipe-related problems until the apartment complex was redeveloped in 2018.
- Full pipe replacement had been estimated at approximately KRW 24 billion, while Jinhaeng RSI installation cost approximately KRW 1 billion, resolving the pipe issues and saving about KRW 23 billion.
-
Before Jinhaeng RSI Installation
-
Before / After Comparison of Jinhaeng RSI Installation
-
Maeil Business Newspaper (May 22, 2014)
New Apartment Complexes
- Installed in Ilsan Xi Apartment with 4,683 households.
- Installed in Sinchon Hillstate Apartment with 1,226 households.
- Installed in Incheon Hillstate The-Zi Apartment with 713 households.
-
Ilsan Xi Apartment
-
Sinchon Hillstate Apartment
-
Incheon Hillstate Xi Apartment
Factory Installation Cases
Installed in major industrial facilities across South Korea, including SK Hynix, Samsung Electronics, LG Chem, LG Electronics, Hyundai Motor, Hyundai Mobis, Hyundai Steel, Hyundai Cement, POSCO, Kumho Petrochemical, Doosan Heavy Industries, Orion, Ottogi, LS Cable & System, SKC, CJ, and many others, with more than 50,000 installations nationwide. (Supplied for over 10 years for use in semiconductor equipment operated by companies such as SK Hynix and LS Mtron.)
-
Hyundai Heavy Industries
-
Hyundai Powertech
-
Hyundai Motor 1
-
Hyundai Motor 2
-
Hyundai Steel
-
POSCO
-
Gwangyang Steel Works
-
Orion
-
Samyang Foods
-
CJ
-
LG Chem
-
SK Hynix
-
LS Mtron 1
-
LS Mtron 2
-
Ildong Pharmaceutical
Overseas Installation Cases
Installed in global facilities including the German Chancellor's Residence, Mercedes-Benz, BMW, Siemens, Honda, ABB, ThyssenKrupp, Vietnam Panda Group, Mitsubishi (Japan), and municipal water systems in Malaysia, Vietnam, and Bahrain.
More than 100,000 overseas installations.
-
Malaysia Johor Bahru Municipal Water Supply
-
Vietnam Ho Chi Minh Municipal Water Supply
-
Brazil Minas Gerais State Municipal Water Supply
-
ThyssenKrupp
-
U.S. Military Base in Japan
-
McDonald's
-
ABB
-
Siemens
-
Hachez